BUSINESS ENGLISH · B1–C1 practice support

Agree an action

How should we test the new layout? Explain your plan.

Updated 2026-09-09 · SpeakBEC editorial project

This topic preserves earlier guided practice. It has not yet completed the new conversation-course editorial review and is not labelled expert-validated.

5 min practice10 min practice15 min practiceSelf-review checkpoint
15 min · Full lesson material

Agree an action

How should we test the new layout? Explain your plan.

How should we test the new layout? Explain your plan.

1 · Notice the conversation

Colleague: How should we test the new layout?

You: We should test a small batch before changing the whole process.

Colleague: What will the trial help us check?

You: This lets us check whether less waste still means good quality.

Colleague: What output should we use to calculate unit cost?

You: We should calculate unit cost using the number of good bags.

2 · Understand what each phrase does

material waste

materials we throw away

We need to reduce material waste.

这里指材料损耗;时间浪费可以用 wasted time,不能直接套 material。

bottleneck

the slow step that holds up the rest

Packing is the production bottleneck.

不是所有慢任务都是瓶颈;它必须限制整体流程的产出。

unit cost

the cost of making one item

Our unit cost is six pounds.

单位成本与总支出不同;比较时要一致地计算成本和产量。

3 · Rehearse, then change the details

We should test a small batch before changing the whole process.

This lets us check whether less waste still means good quality.

We should calculate unit cost using the number of good bags.

We should also check whether packing remains a bottleneck.

Keep the purpose; change the person, document or time. A simple, accurate sentence is enough.

4 · Respond to your colleague

How should we test the new layout?

行动:先小批试做,再决定全线改变。

See one possible reply

We should test a small batch before changing the whole process.

What will the trial help us check?

检验:省料的同时,成品必须合格。

See one possible reply

This lets us check whether less waste still means good quality.

What output should we use to calculate unit cost?

计算口径:用合格袋子数量,不能把次品也当产出。

See one possible reply

We should calculate unit cost using the number of good bags.

5 · Try a different situation

What if the bags fail the quality check?

What if the bags fail the quality check?
Address the changed condition. Choose a practical next step and explain why it helps.

6 · Recall without the model tomorrow

How many bags should we make first?